Showing posts with label Industrial Swift. Show all posts
Showing posts with label Industrial Swift. Show all posts

Thursday, July 25, 2019

Industrial Swift Unloading - Timelapse 07/23-24/2019



The process of unloading a large ship loaded with wind blades is a complicated one.  Here you can view a 100 second timelapse taken over a two day period.

Wednesday, July 24, 2019

Power in the Wind - Industrial Swift

The Industrial Swift unloads more wind turbine blades at the Port today, adding to the storage stockpile.  The blades are in the foreground and the cylindrical pieces are tower sections. Large trucks  will move the components to wind farms in the Midwest.


Monday, July 22, 2019