Sunday, June 28, 2015

HHL Volga arrived Duluth 06/28/2015

The HHL Volga arrived Duluth this afternoon will a load of wind turbine blades destined for North Dakota wind projects operated by Minnesota Power.

The images were taken from the Duluth Aerial Lift Bridge.
HHL Volga

HHL Volga from Duluth Lift Bridge