Monday, March 18, 2013

For Immediate Release - 2013 shipping season gets underway


For Immediate Release from Duluth Port Authority                                                                                                         
March 18, 2013                                                                                                                                                                                                             
Sure sign of spring approaching…
2013 shipping season gets underway in Port of Duluth-Superior

Duluth, Minn., USA (March 18, 2013)—U.S.-flag lakers will begin moving in the Port of Duluth-Superior this week as the 2013 commercial shipping season gets underway on the far western edge of the Great Lakes-St. Lawrence Seaway system. The Mesabi Mineris expected to be the port’s first departure of the season, set for late Tuesday or early Wednesday.    
The Miner is scheduled to begin loading coal Tuesday morning (March 19) at the Superior Midwest Energy Terminal after which the 1,000-footer will move to the Port Terminal to load and install a drive motor for its conveyor system prior to making a cross-lake delivery to Marquette.  She’ll return to Duluth over the weekend to load iron ore at the CN dock then head to Indiana Harbor.  The Canadian-flag CSL Tadoussac is also set to head to Duluth this weekend (from winter layup in Thunder Bay) to load iron ore pellets at CN.
Crews reported for fit-out last week to get many wintering vessels set to sail. Two U.S. Coast Guard cutters (Alder andMackinaw) along with Heritage Marine tugs have been busy breaking ice to open shipping channels and slips around the harbor in preparation for not only the Miner getting underway, but also the Roger Blough, Indiana Harbor and American Century by end of this week. Cutter Biscayne Bay will join in icebreaking operations later this week, as well.
 The departing lakers will secure their places in line with other downbound traffic near Sault Ste. Marie, Mich., to await the reopening of the Soo Locks for the 2013 season at 12:01 a.m. on Tuesday, March 25.   Likewise, there will be a line-up of upboundlakers on the eastern side of the Locks, led by the Paul R. Tregurtha, which means the Twin Ports will likely see regular marine traffic patterns by end of the month (including the American Spirit, scheduled to depart her winter berth in Superior late next week). 
 The Soo Locks are the gateway that allows lake carriers – some measuring more than 1,000 feet in length – to move raw materials like iron ore, coal, limestone, cement and salt between Lake Superior and Lakes Michigan, Huron and Erie. It is also one of 16 sets of locks along the Great Lakes-St. Lawrence Seaway (GLSLS) that allows oceangoing ships (“salties”) to move breakbulk and project cargoes in and out of North America’s heartland and deliver Midwestern grains to Europe, the Middle East and North Africa.
               “We ended the 2012 season having moved just shy of 37 million short tons of cargo through the Port of Duluth-Superior,” noted Adolph Ojard, Duluth Seaway Port Authority executive director, “nearly on par with the previous year.  If the U.S. steel market remains strong and the resurgence of manufacturing in and around the Great Lakes basin continues, iron ore shipments should keep a strong pace. Projections for coal exports are up, plus the extension of wind production tax credits should see project cargoes pick up by fall.  Depending on weather patterns and global economies, we’d also hope for marginal improvements in grain exports.  All in all, the Port of Duluth-Superior should see an increase in activity during 2013.”
  It’s a bit harder to predict the arrival of the Port’s first oceangoing vessel to transit the full GLSLS. The Seaway locks (the Montreal/Lake Ontario section and Welland Canal) will reopen for business on March 22, but it may take awhile for Duluth-Superior to see its first saltie. That “first ship” to pass beneath the Aerial Lift Bridge will be greeted by maritime officials with a welcoming ceremony and will also qualify a winner for the annual “First Ship Contest” sponsored by the Duluth Seaway Port Authority and Visit Duluth. Last year, the Port’s first saltie, the Arubaborg, arrived on April 10.
Of the vessels that arrived in January to winter in the Twin Ports for repair and maintenance,  the John G. Munson and John J. Boland will remain docked until markets pick up pace this season and their services are required. The American Victory and Edward L. Ryerson remain in long-term layup at Fraser Shipyards.
   ##
Close to 1,000 ships visit the Port of Duluth-Superior each year, moving roughly 40 million tons of cargo – iron ore, coal, grain, limestone, cement, salt, plus project cargo and more. As the largest tonnage port on the Great Lakes-Seaway, cargo movements through the Port of Duluth-Superior support 11,500 jobs  and contribute over $1.5 billion in business revenues to the local/regional economy. For more information, www.duluthport.com

NOTE:  All vessel arrival/departure times are estimates and may change without notice.
For updated times, please consult the Boatwatchers Hotline: (218)722-6489 or www.duluthboats.com

FOR MORE INFORMATION or to schedule interviews, please contact :
Adele Yorde  (218) 727-8525, Public Relations Manager, Duluth Seaway Port Authority